top of page

CITY OF HOPE

SHAPIRO

Interior demolition and renovation of an existing cancer research lab. Structural upgrades to the existing building, including steel column strengthening and footing upsizing. All new finishes, including flooring, tile, acoustical ceilings, and paint. All new lab casework with Corian sinks and a new deionized water treatment system for all lab sinks. All new HVAC systems, including new AHU, hydronic heaters, pumps, VFD, and CEV/CAV’s. All new electrical switchgear, panels, and distribution boards. A new acid waste system, new restrooms, new water service to the building, including new backflow and PRV. All new fire sprinkler systems to the building with backflow and riser. All new fire alarm systems to the building and tied into the campus master loop.

PROJECT TYPE:

Lab Research For The COH Cancer Treatment Center

COMPLETION DATE:

June 2020

CLIENT:

Beckman Research Institute
of the City of Hope

DSC_0076-2.jpg

ARCHITECT:

Farnsworth Group

DSC_0061-2.jpg

SQUARE FEET:

14,408 SF

DSC_0066-2.jpg
bottom of page